“
Project Solution
Climatec BTG continues to engineer, furnish and install Alerton BACtalk digital controls for control and monitoring of HVAC system, including a new chiller plant. Climatec has also integrated to a Honeywell LON and a York system via JACE to the Alerton front end. The Alerton system resides on the campus-wide Ethernet network (BACnet/IP), is web based and is regularly maintained by Climatec’s Alerton factory-certified engineers.
Project Results
Industry
Education
Service
Building Automation
Location
Phoenix, AZ
Glendale, AZ
Glendale, AZ
Nationwide
Hollister, CA
Valley Center, CA
Houston, TX
San Diego, CA
Tucson, AZ
San Diego, CA
Plano, TX
Iowa Colony, TX
North Las Vegas, NV
Phoenix, AZ
Santa Clarita, CA
Ontario, CA
Redding, CA
Ramona, CA
New York, NY
Culver City, CA
Arvin, CA
Houston, TX
Bellflower, CA
San Leandro, CA
Holtville, CA
Norco, CA
Castro Valley, CA
Las Vegas, NV
Summerlin, NV
Arlington, TX
Rowland Heights, CA
Glendale, AZ
The Woodlands, TX
Los Angeles, CA
La Jolla, CA
Glendale, AZ
Phoenix, AZ
San Diego, CA
West Hills, CA
San Diego, CA
Los Angeles, CA
Westlake Village, CA
Phoenix, AZ
Phoenix, AZ
Santa Monica, CA
Phoenix, AZ
Phoenix, AZ
Downey, CA
Phoenix Metro Area, AZ
Phoenix, AZ
San Diego, CA
Kern County, CA
Rancho Bernardo, CA
Redondo Beach, CA
Santa Ana, CA
Phoenix, AZ
Los Angeles, CA
San Diego, CA
Santa Ana, CA
San Diego, CA
El Cajon, CA
Fountain Valley, CA
Gilbert, AZ
Project Size
348,000 sq-ft
Over 15 Facilities
266,000 sq. ft.
151,279 Sq Feet
40,810 sq-ft
334015 sq. ft
348,000 sq-ft
30,000 sq ft.
48 stories | 2,100,000 SF
215,000 SF
5 stories
1.7 million SF
17,500 seat arena
80,000 SF
300,000 SF
45,000 SF
18,000 seat arena
11 acre site, 269 guest rooms
262-bed medical center
204-bed Medical Center
350-bed medical center, 675,000 SF
21 hospital sites in Arizona & California
80,000 SF
16,000 SF
34 stories, 635,000 SF
212 Beds
Technologies
- Alerton BACtalk
- BACnet